Kandos Cement & The Mudgee Line

$39.95 inc. GST

2 in stock

SKU: TSDVD14 Category:

Description

Trackside Videos.

Approx. running time: 99 mins.

This video follows the round trip operation of Kandos cement trains between Sydney and the Kandos Cement Works from 1996 to 2001. A 2009 Review shows the changes since 2001.

Additional information

Weight 0.2 kg
Dimensions 19 × 14 × 2 cm