Description
Trackside Videos.
Approx. running time: 99 mins.
This video follows the round trip operation of Kandos cement trains between Sydney and the Kandos Cement Works from 1996 to 2001. A 2009 Review shows the changes since 2001.
$39.95 inc. GST
2 in stock
Trackside Videos.
Approx. running time: 99 mins.
This video follows the round trip operation of Kandos cement trains between Sydney and the Kandos Cement Works from 1996 to 2001. A 2009 Review shows the changes since 2001.
Weight | 0.2 kg |
---|---|
Dimensions | 19 × 14 × 2 cm |